Mr Michael Hoctor Capel Glen Pinfold Hill Isle Of Man Laxey IM4 7HP
TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure) Order 2019
In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr Roger Smith, Ref 24/91394/B, for the Erection of ground mounted solar pv array at Claddagh Farm Sulby Bridge Sulby Isle Of Man IM7 2EZ .
Any conditions or notes which apply to the approval are set out below. This approval is subject to compliance with any conditions listed and may not be implemented until it becomes final (see guidance notes).
Reason: To comply with Article 26 of the Town and Country Planning (Development Procedure) Order 2019 and to avoid the accumulation of unimplemented planning approvals.
Reason: the application has been assessed on this basis in accordance with the drawing submitted and in the interest of the ecosystems and marshy grassland within the area.
Reason: The structures have been exceptionally approved solely to meet sustainable energy need and its subsequent retention would result in an unwarranted intrusion in the countryside.
This approval relates to the following:
o Site Photos o Utilities Map
o Flood Risk Assessment o Solar Installation Guide o Proposed Solar Array o Solar Datasheets
This decision has been made for the following reasons(s) Overall the principle of solar panels is considered acceptable as per paragraph 12.2.8 and Energy Policy 4 of the Strategic Plan and aligning with those parts of the Climate Change Act 2021 and Climate Change Action Plan 2022-27 in reducing greenhouse gas emissions. The visual and amenity impact is considered to be acceptable meeting with Environment Policies 1, 2 and 22 and is not to result in any adverse loss of agricultural land nor impact habitats in line with Environment Policies 4 and 14. Conditions will be added to ensure the panels and any ground works and framing are removed in the event they are no longer needed, and that their siting be in full accordance with the submitted plans being 27m from the access lane to the main house to ensure no harm to the marshy grassland.
Date of Issue: 23rd May 2025
J CHANCE Director of Planning and Building Control
Guidance Note
This decision was made by the Planning Committee in accordance with the authority delegated to it.
This decision refers only to that applied for under the Town and Country Planning Act 1999 and its subordinate legislation.
A copy of the Officer’s report and any correspondence which informed the assessment and decision is available to view on the Government’s website (via https://pbc.gov.im/onlineapplications/)
Implementation A determination to grant planning approval does not have effect —
Development must be carried out in accordance with the approved plans and any attached conditions (irrespective of any changes that may separately be requested at the Building Control stage or by any other Statutory Authority). This approval does not remove the need to also comply with any other relevant legislation.
Any conditions requiring certain works, submissions etc. prior to commencement of development must be fulfilled prior to work starting on site. Failure to adhere to this approval and meet the requirements of all conditions may invalidate this approval or result in formal enforcement action.
Appeal Any appeal can only be made by a person who has been accorded rights to do so, must be in writing, include the appropriate fee and be submitted to the Department within 21 days of the date of this Notice.
Guidance on how to appeal is available at gov.im/howtoappeal
Copyright in submitted documents remains with their authors. Request removal