25 February 2026 · Committee
Land Adjacent To, Ginger Hall Hotel, Ballamanagh Road, Sulby, Isle Of Man, IM7 2hb
This application sought permission to build 14 bungalows on land adjacent to the Ginger Hall Hotel on Ballamanagh Road, Sulby, including a new vehicular access and associated infrastructure. The planning committee refused the application on 25 February 2026, going against the case officer's recommendation to permit it. The committee identified three main concerns: the density of the scheme and its relationship with existing bungalows to the west would cause visual harm and not reflect local character; the applicant had not provided enough information to demonstrate that adequate drainage could be delivered; and the proposed access onto the A3, which would require drivers to turn right across oncoming traffic close to a bend, was considered unsafe. The site at Lezayre has a planning history with at least three previous applications recorded.
The planning committee refused the application, overturning the officer's recommendation to approve. The committee found that the density of the development and its proximity to existing bungalows to the west would cause visual harm and fail to reflect local character. The committee also found that insufficient information had been provided to show adequate drainage could be achieved, and that the proposed access onto the A3 — requiring vehicles to turn right across oncoming traffic near a bend — would be unsafe.
Refusal Reasons
Development to make the best use of resources
Strategic Policy 1: Development should make the best use of resources by: (a) optimising the use of previously developed land, redundant buildings, unused and under -used land and buildings, and re - using scarce indigenous building materials; (b) ensuring efficient use of sites, taking into account the needs for access, landscaping, open space (1) and amenity standards; and (c) being located so as to utilise existing and planned infrastructure, facilities and services. 4.2.2 In pursuance of (c) abo ve, the Department will, when formulating its programme for the preparation of new Area Plans, have particular regard to: (a) the availability of mains drainage connected to IRIS or other mains systems; (b) securing the future viability of rural primary schools; (c) the public investment in the Island's highway, bus, railway and tramway networks; (d) the provision and availability of water; and (e) community facilities. 4.3 Environment 4.3.1
Priority for new development to identified towns and villages
Strategic Policy 2: New development will be located primarily within our existing towns and villages, or, where appropriate, in sustainable urban extensions(2) of these towns and villages. Development will be permitted in the countryside only in the exceptional circumstances identified in paragraph 6.3. (1) Open Space is defined in Appendix 1. (2) Sustainable Urban Extensions are defined in Appendix 1 4.3.2 Appendix 3 to the Plan identifies the towns and villages, and also explains why the Department has rejected the idea of a new settlement, which was mooted in the Consultation Draft published in May 2000. 4.3.3 Each of our towns and villages has an ind ividual character arising not only from its geographical position and existing fabric, but also from its historical, cultural, and social background. This character should be protected and enhanced. Accordingly:
To respect the character of our towns and villages
Strategic Policy 3: Proposals for development must ensure that the individual character of our towns and villages is protected or enhanced by: (a) avoiding coalescence and maintaining adequate physical separation between settlements; and (b) having regard in the design of new development to th e use of local materials and character. 4.3.4 Most of our built heritage, our countryside, our coastline and our natural environment is of attraction, value and interest. Surveys commissioned by Government on the quality of life and the importance of heritage in the Isle of Man and internationally, have consistently shown that the historic landscape setting of the Isle of Man scores as t he single most significant factor for residents and visitors in supporting the concept of a specific and positive Manx identity. This "heritage identity" is a result of the combination of a rich diversity of historic sites and monuments, historic building s and residential settlements and a specific range of natural history attributes set within a predominantly rural landscape setting which links modern life to a sense of historic legacy and beauty, the retention of which is strongly supported by Government and the resident community. 4.3.5 The landscapes of the Island are very varied, and their nature and variety is the consequence of thousands of years of interaction between the natural and cultural aspects of the Island through human activity within the enviro nment and an innate respect for the natural and historic qualities they represent. 4.3.6 This landscape heritage is more than simply the sum of its parts. The combination of geology, geomorphology, wildlife, archaeology, history, traditional buildings and the natural settings for traditional activities and customs, combine in the rural and built environment to provide an inseparable element of "Manxness". It provides an overarching context which makes the landscapes of the Isle of Man unique and gives them the value which is acknowledged by those who live here and those who visit. The protection and promotion of this element within Manx society is an important element in central Government policy and the Strategic Plan, which both support the view that these v alued characteristics of the Isle of Man be acknowledged and protected for the future from inappropriate development. 4.3.7 This protection will apply to areas of heritage value, to sites of heritage value and to general traditional landscape settings within the Island which are deemed to contribute to the sense of the Island's heritage identity. Heritage landscape value will therefore be a consideration in all aspects of planning, with a view to retaining and enhancing this value wherever possible.
Development in Remaining Villages
General Development Considerations
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Development and flood risk
irements of the relevant gas supply agency. Flood Risk 63 There was widespread concern about the adequacy of drainage and the risk of flooding, particularly in parts of Braddan, Onchan and Laxey. Environment Policy 10 of the Strategic Plan indicates that where development is proposed on any site where there is a potential risk of flooding, the prospective developer will be required to submit a flood risk assessment, together with details of proposed mitigation measures. This approach is reinforced in Utilities Proposal 6 of the draft Area Plan, which (among other things) requires the incorporation of Sustainable Drainage Systems (SuDS) into new developments, to attenuate the rate of surface water run-off. I consider these policies to be reasonable. Clearly, without adequate mitigation measures, new building should normally be resisted on land which is at serious risk of flooding, or where the proposed development would increase the flood risk elsewhere. 64 In my view, the format of Utilities Proposal 6 could be improved. First, as a Proposal of the Area Plan, I consider that it should be in a bold typeface, to differentiate it from the supporting text. (The same applies to a number of other policies e.g. Transport Policy 2, and Utilities Policies 2 and 5). Second, there appears to be an error of syntax at the start of the second sentence of Utilities Proposal 6, which should perhaps read 'Strategies to achieve this will include …'. Third, the third bullet point of this Proposal introduces SuDS. Subsequent bullet points describe features of SuDS, and are therefore subordinate to the third bullet point. For clarity, I consider that they should be indented. I recommend that the draft Area Plan be modified accordingly. Sewage Treatment 65 There was also some public concern about the adequacy of the sewerage system, both in terms of its capacity to accommodate the effluent from proposed residential development areas, and in terms of the current practice of discharging untreated sewage into the sea. Infrastructure Policy 1 of the Strategic Plan indicates that developments entailing the erection of multiple dwellings should take place only on sites that will ultimately be connected to the IRIS system, which takes sewage to a treatment works at Meary Veg. (IRIS is an acronym for Integration and Recycling of the Island's Sewage). However, as long ago as 2006/7, a review was undertaken to decide whether to continue with the IRIS strategy. This concluded that it would be beneficial to adopt a regional sewage treatment strategy (RSTS) for those settlements that were not already connected to the IRIS system, including Laxey, Baldrine and settlements in the Central Valley. To that extent, Infrastructure Policy 1 of the Strategic Plan is now out of date. 66 I understand that a planning application will soon be submitted for the development of a local sewage treatment facility for Laxey. Feasibility studies for the provision of a similar facility to serve Baldrine are ongoing. A replacement sewage works at Ballagarey, serving part of the Central Valley became operational in 2018. However, capacity limitations mean that planned development in Crosby is likely to have to rely on standalone sewage treatment for the time being, until the existing treatment works is replaced as anticipated in 2022. The Programme for Government (2016-2021) indicates an intention to complete the regional sewage treatment infrastructure within the lifetime of the present administration. 67 It seems to me that these considerations should be taken into account in the allocation and phasing of land for development. I will return to this matter when considering the draft Area Plan's proposals for housing. Electricity Renewable Energy 68 Peel Energy considered that the Area Plan should contain a detailed and specific chapter on renewable energy, providing measurable criteria against which applications for the development of renewable power generating facilities would be assessed. They cited the States of Jersey Island Plan 2011, which includes such material. And they pointed out that a Climate Change Emergency has recently been declared on the Isle of Man; that a Climate Change Bill is soon to be presented to Tynwald; and that there has been strong public support for the Government's Climate Change Mitigation Strategy. They argued that, in failing to provide detailed guidance on renewable power generation, the Area Plan was inconsistent with the Strategic Plan; and that since the Area Plan post-dated the Strategic Plan, its largely negative provisions would prevail. 69 Energy Policy 4 of the Strategic Plan applies to development proposals for renewable energy generated by wind, water, tidal or solar power. It indicates that any such proposals will be judged against that Plan's environmental objectives. Proposals for wind, water or tidal power would need to be supported by an Environmental Impact Assessment. The supporting text indicates that renewable energy schemes will be given similar scrutiny as is gi
Designed to respect the character and identity of the locality
pment. 8.13.2 The extent of formal open space with in settlement boundaries in the South is identified on the Proposals Map (Map 3) and Inset Maps (Maps 4-7). The Isle of Man Strategic Plan (Environment Policy 42) seeks to protect these open spaces and indicates that: 8.13.3 "Inappropriate backland development, and the removal of open or green spaces which contribute to the visual amenity and sense of place of a partic ular area will not be permitted.''
Highway safety
Transport Policy 4: The new and existing highways which serve any n ew development must be designed so as to be capable of accommodating the vehicle and pedestrian journeys generated by that development in a safe and appropriate manner, and in accordance with the environmental objectives of this plan. 11.3.2 Notwithstanding policies within this plan which encourage travel by means other than private car it is anticipated that the number of vehicles using the Island's roads will continue to increase. This increase in demand is likely to lead to a greater need for road impro vements in order that travel can take place in a safe, effective, and environmentally acceptable manner. The Department of Transport will continue to assess the need for such improvements to public highways and undertake works where appropriate, with much of the improvement within existing roads carried out under the provisions of the Town and Country Planning (Permitted Development) Order2005. The need for improvements to the Island's highway network must be balanced against the environmental objectives of this plan.
Parking
Transport Policy 7: The Department will require that in all new development, parking provision must be in accordance with the Department's current standards. The current standards are set out in Appendix 7. 11.5.4 New development can have a significant impact in terms of the traffic generated by it and the impact on the various modes of travel. The Department considers that proposals which are likely to be significant traffic generators should be accompanied by a Transport Assessment(1) which should look at all modes of transport including access by public transport, cycling and on foot.