Loading document...
334978
Pond
334975
Path
The Bungalows
CR
Station
CHIARN
CLOSE
The Cottage
El
Sub
334976
Drain
Close Chiarn
Top Soil Stock Pile
A 27
10 8
6 4
PCS and EWW Compound
El Sub Stn
Metal Waste Skip Wood Waste Skip Mixed Waste Skip
El Ps
Tuke and Bell Compound
Castle View Nursing Home
Tower Lights
314543
Secure Site Entrance Gate Vehicle Mirror For Restricted View Exit Timber Hoarding
Sedi Mats
Secure Gate
Ballaterson Farm Mixed Waste Skip Staff and visitor parking Track Path (um)
Toilets
Drying Room
Filter / Run off Drain
Silt Buster
Welfare Welfare
Office Office
311881
River Neb
El P
Foot Bridge
334973
ETL
314548
El Sub
Sta
25 19
BALLATESSAN MEADOW
Ruin
311884
Track
314549
314537
Weir
314544
Key
Site Entrance
Pipeline Spread
All compound areas will be leveled and compacted with stone before use.
Job Title
Peel Sewage Treatment Works
Drawing Title
Site Compound Plan
Status
Job Reference Scale
NTS
AJY
20/11/24
A1
Revision
PCS - 098 D
Copyright in submitted documents remains with their authors. Request removal