22 May 2025 · Committee
Ballachrink Farm, Brack A Broom Lane, Poortown, Peel, Isle Of Man, IM5 2ap
Permission was granted for the erection of a polytunnel, glasshouse, and barn/stables at Part Fields 312149 and 312151, forming part of Ballachrink Farm on Brack-A-Broom Lane, Poortown, Peel, Isle of Man. The farm already contains a detached farmhouse, three agricultural sheds, and a long stone barn. The site sits in open countryside but is screened from its surroundings by mature hedgerows and tree belts. The nearest dwelling and the nearest agricultural buildings at the neighbouring site are each around 160 metres away. Officers assessed the principle of the development, its impact on the character of the countryside, effects on neighbouring amenity, ecological impacts, highway safety, and trees. The application was approved by the Department of Environment, Food and Agriculture on 22 May 2025, subject to ten conditions.
The Department of Environment, Food and Agriculture approved the application on 22 May 2025. Officers considered the principle of the development acceptable and found that the proposal would not cause unacceptable harm to the character of the open countryside, neighbouring amenities, ecology, highway safety, or trees. Ten conditions were attached to the permission.
Business Policy 1
The proposed development is considered acceptable as it aligns with Business Policy 1 of the Isle of Man Strategic Plan
Business Policy 1: The growth of employment opportunities throughout the Island will be encouraged provided that development proposals accord with the policies of this Plan. 9.1.3 This chapter concent rates on the land use implications of business activity, including industry, storage and distribution, office and commercial development, retailing and tourism. 9.1.4 In respect of employment land availability, the Department has undertaken and published an Employment Land Availability Study (1). A summary of this is included in Appendix 9. Across the Island there are some 118 hectares of land allocated for industrial development. Much of this is concentrated around Ballasalla and the Airport. There is, however, a spread of land available across the Island to support employment and regeneration opportunities in each area. Such land will be important to support the regeneration of the Service Centres and the Gateway and Employment role of the Airport area. 9.1.5 The Douglas area has seen by far the bulk of the industrial land take up in recent decades and much of the land allocated for such purposes has been taken up. This is why the Department has resolved to proceed with a Development Order for the development of some 20 hectares of employment land to the south of Cooil Road. A recent report on the take up of industrial land in the Douglas area indicates that it has been faster than anticipated and at current rates that all the land will be required by 2015. While the situation will be subject to detailed assessment in the preparation of the Plan for the East, the Department is satisfied that the release of additional land is both necessary and appropriate at this stage. 9.1.6 The Department has also reviewed planning permissions for office development. The majority of these are focused in the Douglas area. Take up has been low in recent years with the exception of certain relocations to corporate headquarters, such as Skandia. There are a number o f sites still available for new office development, in addition to the existing stock. Of note is the recent trend for sites with office consents to subsequently secure planning permission for residential use. The most notable example being the final pha se of the Villiers development, which now has a residential permission in addition to its partly - implemented office consent. 9.1.7 The following information has been extracted from the Review of Economic Strategy (Treasury 2003) which formed part of the background to the Economic Strategy 2004 approved by Tynwald in October that year. (1) Employment Land Availability Study DLGE 2007 9.1.8 The Isle of Man has enjoyed unprecedented economic success in the last ten years. Over this period annual gross domestic product, or GDP (the value of the economy' s output of all goods and services), has more than doubled in real terms (both absolute and per capita) such that from a deficit of around one quarter, per capita GDP in the Isle of Man now exceeds that of the UK by 7% and the average for the European Union (EU 15) by 10%. 9.1.9 The period 1993 - 2000 saw the economy not only expanding but doing so at an accelerating rate, before slowing in 2000/01. Since 2001 the economy has continued to grow at around 5% per annum (the latest national income accounts revealed growth of 5.9% in 2002/03), meaning that, after the recession in the early 1980's the Isle of Man economy has recorded economic growth in each of the last twenty years. 9.1.10 This economic performance has been led by the financial and related se rvices sectors. The finance industry grew by over 80% between 1996 and 2001 alone. But the table below illustrates that probably all areas of Manx economy are today generating more income in real terms than a decade ago, even it the relative importance o f some, most noticeably manufacturing, has declined. Table One - Sectoral Contributions to National Income 1992/93 v 2000/01 (at 2000/01 prices) Contributions to National Income (£) Real Increase in income generated (%) 1992/93 % 2000/01 % Manufacturing 72.0 11 76.7 6 6.5 Finance 229.7 35 505.4 41 120.0 Tourism 41.0 6 67.7 6 65.1 Agriculture/Fishing 11.7 2 15.8 1 35.0 Construction 46.7 7 89.6 7 91.9 Professional Services 96.7 15 186.1 15 92.4 Utilities, Distribution and Miscellaneous Services 133.1 20 223.8 18 68.1 Pubic Administration 34.6 5 53.6 4 54.9 Total 665.5 100 1,218.7 100 83.1 9.1.11 National income data aside, the clearest indication of the economic success enjoyed by the Island in recent times comes from the labour market. Census results show that the workforce increased from 33,189 in 1991 to 39,685 by 2001, an increase almost identical to that in the total resident population over the period. But the number seeking emp loyment but who were unemployed at the time halved from 1,360 to 635. 9.1.12 Changes in the underlying structure of the economy reflected in the national income accounts are further depicted in the Census statistics below showing the distribution of labour between the different sectors of the economy. Table Two - Employment by Sector 1991 v 1996 1991 1996 2001 No. % No. % No. % Agriculture and Fishing 1,240 3.9 938 2.8 543 1.4 Manufacturing 3,348 10.5 3,562 10.6 3,185 8.2 Construction 3,404 10.7 3,372 10.0 2,512 6.4 Utilities1 513 1.6 462 1.4 515 1.3 Transport and Communications 2,437 7.7 2,688 8.0 2,970 7.6 Wholesaling and Retailing 3,844 12.1 3,692 11.0 4,372 11.2 Finance 4,353 13.7 5,942 17.7 8,959 22.9 ICT2 n.a n.a n.a n.a 361 0.9 Professional Services 5,438 17.1 6,081 18.1 7,296 18.7 Tourist Accommodation 856 2.7 765 2.3 743 1.9 Entertainment and Catering 1,403 4.4 1,156 3.4 2,116 5.4 Miscellaneous Services 2,849 9.0 2,768 8.2 2,373 6.1 Public Administration 2,144 6.7 2,146 6.4 3,105 8.0 Total 31,829 100.0 33,5773 100.0 39,050 100.0 Notes: 1 Electricity, gas and water 2 Not separated out from other sectors until 2001 3 Includes 5 where occupation not recorded 9.2 Industry and Storage and Distribution 9.2.1 The nature of industrial activity on the Island changed very considerably during the last century. The previously dominant primary industries of fishing and agriculture now contribute only 1% to the Gross Domestic Product (GDP) and provide only 1.4% of our total employment, whereas manufacturing contributes 6% to the GDP and provides 8.2% of our employment, and the construction industry contributes 6% to the GDP and provides 6.4% of our employment. Storage and distribution has also become a more important activity, particularly in terms of the demands it makes on land, buildings, and access requirements. 9.2.2 Most of the Island's industry is located close to major transportation links, particularly in the case of Douglas, Braddan and Ballasalla, which all have convenient access to Ronaldsway airport and Douglas harbour. Ramsey and Peel harbours are used for the importation and exportation of large scale good s (fuel, building supplies etc). All of these are conveniently accessible to significant pools of labour. In order to minimise excessive transportation of goods and travel for employees, and to promote sustainable development, much of the Island's future industrial development should continue to be concentrated in these locations, and appropriate areas of land should be made available for such uses in the Area Plans for these parts of the Island. It will also be appropriate, when formulating Area Plans for our smaller settlements, to make provision for the continued operation of small -scale family businesses, particu
Protection of the countryside and inherent ecology
The siting, scale, and design of the structures adhere to Environment Policy 1
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
General Development Considerations
General Policy 2: Development which is in accordance with the land-use zoning and proposals in the appropriate Area Plan and with other policies of this Strategic Plan will normally be permitted, provided that the development: (a) is in accordance with the design brief in the Area Plan where there is such a brief; (b) respects the site and surroundings in terms of the siting, layout, scale, form, design and landscaping of buildings and the spaces around them; (c) does not affect adversely the character of the surrounding landscape or townscape; (d) does not adversely affect the protected wildlife or locally important habitats on the site or adjacent land, including water courses; (e) does not affect adversely public views of the sea; (f) incorporates where possible existing topography and landscape features, particularly trees and sod banks; (g) does not affect adversely the amenity of local residents or the character of the locality; (h) provides satisfactory amenity standards in itself, including where appropriate safe and convenient access for all highway users, together with adequate parking, servicing and manoeuvring space; (i) does not have an unacceptable effect on road safety or traffic flows on the local highways; (j) can be provided with all necessary services; (k) does not prejudice the use or development of adjoining land in accordance with the appropriate Area Plan; (l) is not on contaminated land or subject to unreasonable risk of erosion or flooding; (m) takes account of community and personal safety and security in the design of buildings and the spaces around them; and (n) is designed having due regard to best practice in reducing energy consumption. 6.3 Development outside of areas zoned for development
Protects biodiversity
maintaining compliance with Environment Policies 1 and 4
uch as this, the breaks in the urban fabric and the features of nature which provide a sense of openness should be protected from development which would erode this (see Maps 3 and 10). Natural Environment Proposal 4 (Green Gap) Between the settlements of Glen Vine and Crosby, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. Douglas, Union Mills and Strang (see Maps 3, 4 and 8) Natural Environment Proposal 5 (Green Gap) Between the settlements of and Douglas, Union Mills and Strang, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. The Upland Environment The Manx Uplands are an iconic part of our landscape and heritage. Reference to the 'sweet mountain air' and 'green hills and rocks' are enshrined in our national anthem and the colours of the heather and gorse are woven into the very fabric of Manx tartan. The hills are a place of great beauty, yet for some they are also a place to work and for others a place to exercise or simply enjoy open space. Our Uplands are also home to plants and animals that whilst familiar to us, are rare and impor tant in a global and European context. Furthermore, the uplands are a rich repository of cultural and archaeological remains, which are sensitive to change and can easily be damaged by inappropriate development. Production of food is an important and obvi ous function of hill land. But surprisingly, the Manx hills provide everyday functions that most people take for granted. Peatlands, which cover most of our hills reduce the impacts of climate change by locking up carbon dioxide, collect and filter our drinking water and slow the passage of rainfall into streams and rivers, thus reducing downstream flood risk. These multiple uses are of great benefit to the economy of the Isle of Man and the well - being of its people. It is important that the hills continue to provide these benefits long into the future. Ensuring sustainable management of such a wide range of uses to the satisfaction of all interested parties whilst retaining functions essential to the well -being of the Isle of Man is of paramount importance. The Isle of Man Government is the owner and landlord for the majority of the Uplands in the East region and is therefore in a position to implement policy which will deliver the optimum range of ecosystem services. Appropriate and positive Upland management such as controlled rotational burning/cutting of heather and low intensity grazing helps to reduce the fuel load of the hill, provides firebreaks and reduces the risk of unplanned wildfires that further protects the biodiversity of the site, but also the vast amounts of carbon locked away in the peat soils. The majority of this work is carried out by The Department of Environment, Food & Agriculture's grazing and shooting tenants. The Manx Uplands are critically important from a habitat and biodiversity perspective. The hills in the East support a significant number of breeding hen harriers; however, other native Upland breeding birds such as curlew and red grouse have suffered severe declines in recent decades and as such are of high conservation concern. Strict control of access and recreational activity on vulnerable soils should be implemented to reduce soil erosion and subsequent carbon loss. Curlew and hen harriers are recognised as an internationally important species, while (within the EU) upland heather moorland is designated as a priority habitat. In order to ensure protection and positive management of the Uplands, the following proposal is appropriate: Environment Proposal 6 Uses of the Uplands that contribute to the management and preservation of this distinctive environment will be supported. Dark Skies On the Isle of Man, 26 Dark Sky Discovery Sites have been identified, of which nine are located in the East. They are classified as Milky Way Sites meaning that at these sites the Milky Way is visible to the naked eye. The sites are accessible and light pollution is limited. The following Dark Sky Discovery Sites are located within the East: • Port Soderick Upper Car Park • Port Soderick Brooghs, Little Ness Car Park • Mount Murray Golf Club • Onchan Park • West Baldwin Reservoir Car Park • Clypse Kerrowdhoo Reservoir Car Park • Conrhenny Car Park • Ballanette Nature Reserve • Axnfell Plantation Natural Environment Proposal 7 Proposals for development in the vicinity of Dark Sky Discovery Sites are to have minimal outdoor lighting and be encouraged to have a design response which is non-intrusive into the darkness of night. Baffling and directionality of lighting must be sensitive to contain any necessary lighting within a subject site only. Watercourses and Wetlands The collection of hills in the East has produced a network of mountain streams which gradually join and widen to become the rivers flowing out into Douglas Bay, Port Groudle a
Environment Policy 15
Environment Policy 15: Where the Department is satisfied that there is agricultural or horticultural need for a new building (including a dwelling), sufficient to outweigh the general policy against development in the countryside, and that the impact of this developme nt including buildings, accesses, servicing etc. is acceptable, such development must be sited as close as is practically possible to existing building groups and be appropriate in terms of scale, materials, colour, siting and form to ensure that all new d evelopments are sympathetic to the landscape and built environment of which they will form a part. Only in exceptional circumstances will buildings be permitted in exposed or isolated areas or close to public highways and in all such cases will be subject to appropriate landscaping. The nature and materials of construction must also be appropriate to t he purposes for which it is intended. Where new agricultural buildings are proposed next to or close to existing residential properties, care must be taken to ensure that there is no unacceptable adverse impact through any activity, although it must be b orne in mind that many farming activities require buildings which are best sited, in landscape terms, close to existing building groups in the rural landscape.
Environment Policy 17
opportunity for diversification and re -use. The Department will continue to treat proposals for re-use positively, where they comply with current policy guidance namely Environment Policy 16 and Environment Policy 17, set out in the Isle of Man Strategic Plan, 2007. Manx National Heritage is likely to seek recording of such buildings and farmsteads prior to redevelopment and particular regard should be had to the Isle of Man Strategic Plan - Environment Policy 41 - in this respect.
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
No retail sales shall take place from any of the buildings hereby approved.
Condition 3
The building/structures hereby approved shall be removed and the ground restored to its former condition in the event that they are no longer used or required for agricultural or horticultural purposes.
Condition 4
The building/structures may only be used for horticultural, agricultural or equestrian purposes.
Condition 5
The stables shall be for private use only and not for any commercial or private livery use.
Condition 6
Prior to the removal of any tree on site, a Bat Roost Assessment shall be undertaken by a suitably qualified ecologist to determine the presence of bat roosts or potential roost features. The findings, including any required mitigation measures, shall be submitted to and approved in writing by the Department. The development shall be carried out strictly in accordance with the Roost Assessment.
Condition 7
Prior to the installation of any lighting within or associated with the glasshouse, a detailed lighting scheme shall be submitted to and approved in writing by the Department. The scheme must be designed in accordance with the recommendations of the BCT and ILP Guidance Note 8: Bats and Artificial Lighting (12th September 2018) to minimize disruption to nocturnal wildlife. The lighting details shall include detailed drawings of the proposed lighting columns and fittings, information about the levels of luminance and daily duration and any measures for mitigating the effects of light pollution. The development shall not be carried out other than in accordance with the approved scheme.
Condition 8
No later than the first planting season following the buildings hereby approved being brought into use, all tree planting associated with the development shall be carried out in strict accordance with the approved landscape drawing. Any alterations to the species, location, or planting arrangement must be submitted to and approved in writing by the Department prior to implementation. Any retained tree which within five years of the approved development being occupied or completed (whichever is the later) dies, are removed or become seriously damaged or diseased shall be replaced by a similar species, of a size to be first approved in writing by the Department, during the next planting season or in accordance with a programme of replacement to be agreed in writing with the Department.
Condition 9
All tree protection measures associated with the development shall be carried out in strict accordance with the approved Wilson Tree Care Ltd Arboricultural Impact Assessment (AIA) - BS 5837, specifically within Section 5: Arboricultural Impacts, and the Tree Protection Plan (TPP) Drawing No. 5112-WTC-TPP-V1. Within the Construction Exclusion Zones identified on Drawing No. 5112-WTC-TPP-V1, nothing shall be stored, placed or disposed of above or below ground, the ground level shall not be altered, no excavations shall be made, no mixing of cement or use of other contaminating materials or substances shall take place, nor shall any fires be lit.
Condition 10
The installation of the glasshouse glazing must be installed with methods for the prevention of bird strike which may include etching, decals or ultraviolet coatings prior to the building being brought into use and shall be retained as such thereafter.