Works are complete with the exception of the installation of the cable duct from the lighting column to the supply box, the pulling of the supply cable and the installation of the bollards.
Health and Safety Comments
None.
Attachments to Report: Photographic PDF
Attachments to Report: Photographic PDF
Attachments to Report: Photographic PDF
NEC Supervisors Signature:A. Watts
Date: 12.01.2022
Mobile: 567554
Accompanying Photographs
Date Taken: 11.01.2022