24 October 2024 · Delegated
Field 624255, Glen Mona Loop Road, Glen Mona, Ramsey, Isle Of Man, IM7 1hg
The application varied Condition 1 of the approved reserved matters permission (22/01558/REM) for the erection of a new dwelling on an open, sloping parcel of land at Glen Mona Loop Road, south east of Glen Mona Village. The site slopes downward from the road to the east and is flanked by mature trees and hedgerows shared with neighbouring properties Barony View and Fieldhead. The key planning issues assessed were the visual impact on the countryside and landscape, effects on neighbouring residential amenities, highway safety and parking, and ecology. Officers concluded that the proposal, including additional details of an air source heat pump, would not cause significant harm to public or private amenities, the countryside, or landscape character, and that access arrangements including visibility splays of 70 metres in both directions met highway safety requirements. Eleven conditions were attached, including measures to prevent bird strikes on glazing and a requirement for an updated ecological appraisal if development had not commenced by August 2025.
The extension of time was approved because the underlying development remained acceptable: it would not harm the character or quality of the landscape, would not adversely affect the countryside, and would not cause significant impacts on neighbouring amenities. The proposal was found to comply with Environment Policies 1 and 2 and Housing Policy 14 of the Isle of Man Strategic Plan 2016, as well as the Residential Design Guide 2021.
The countryside and its ecology will be protected for its own sake
Area Plan for the East sets out locally-applicable means for implementing the policies set out in the Isle of Man Strategic Plan 2016. In that Strategic Plan, we find the Environment Policies. Environment Policy 1 states: The countryside and its ecology will be protected for its own sake. For the purposes of this policy, the countryside comprises all land which is outside the settlements defined in Appendix 3 at A.3.6 or which is not designated for future development on an Area Plan. Development which would adversely affect the countryside will not be permitted unless there is an over- riding national need in land use planning terms which outweighs the requirement to protect these areas and for which there is no reasonable and acceptable alternative. Maintaining the purpose of this Area Plan as a means of implementation, there is some further direction to be found in the Strategic Plan, at paragraph 7.2.1: 'Whilst landscape and coastal change is inevitable, and in some cases desirable, the emphasis must be on the appropriateness of this change and the balance or equity between the needs of conservation and those of development. The primary goal must therefore be to respect, maintain and enhance the natural and cultural environment including nature conservation and landscape and coastal quality, and ensure its protection from inappropriate development.' Given the comprehensive nature of the Isle of Man Strategic Plan's Environmental Policies, only a small number of additional Proposals and Recommendations are necessary. In order to produce an implementable Area Plan for the East it is necessary to recognise those statutory desig nations and strategies which whilst having an Island-wide scope are highly relevant to the protection of environments within the Plan Area. An example is the UNESCO Biosphere status afforded to the Isle of Man. Island-level strategies identify crossborder issues and take account of the cumulative impacts of human engagement with nature. Area Plan Objectives i. To protect, conserve and enhance the natural and cultural environment of the plan area and promote biodiversity. ii. To improve the function, usability and provision of our green infrastructure and public spaces by providing a network of green spaces and features which are connected and where possible, accessible to the public. iii. To manage and improve flood risk and improve drainage conditions. iv. To support the working countryside and its custodians in maintaini ng a sustainable rural economy. Area Plan Desired Outcomes i. Where approved, d evelopment will be ecologically sustainable and designed to protect and where possible enhance biodiversity as well as mitigate and adapt to the effects of climate change. ii. The Green Infrastructure network will be established and fostered, connecting people with nature in a way that achieves the best shared outcomes for the urban and natural environment. iii. Statutory and non-statutory designations will continue to provide protection to the most important and most vulnerable cultural assets, habitats and environments in the plan area. iv. Beyond the towns and villages, the area as a whole will retain its landscape setting including its important visual interaction with the central uplands, central valley, coast and marine environment. Natural Environment Proposal 1 The Department supports the protection, creation and improvement of green infrastructure in the East, particularly in those locations which have the potential to be part of a Green Infrastructure Network. Applications for development must take into account any approved Government Green Infrastructure Strategies, but in any case, must identify how development proposals intend to contribute to the long term provision of a network of connected green spaces. UNESCO Biosphere In 2017, the Isle of Man became the first ever entire nation to achieve UNESCO Biosphere status. Project partners pledge to take steps to protect natural resources, develop the economy in a sustainable way and promote outstanding living landscapes. UNESCO Biosphere Reserves are established to connect people and the economy with nature, wildlife, culture, heritage and communities. Biosphere Reserves have three functions: Conservation: to contribute to the conservation of landscapes, ecosystems, species and genetic variation. Development: to foster economic and human development which is socio -culturally and ecologically sustainable. Logistic support: to support demonstration projects, environmental education and training, research and monitoring related to local, regional, national and global issues of conservation and sustainable development. The Isle of Man Biosphere is zoned into six areas . Examples of all of these can be found in the Eastern area: Terrestrial Core areas, Marine Core areas, Terrestrial Buffer zone, Marine Buffer zone, Terrestrial Transition areas and Marine Transition areas. There is some overlap with The Isle of Man's First Biodiversity Strategy 2015-20
The present system of landscape classification of Areas of High Landscape or Coastal Value and Scenic Significance
d/Governor 's Road junction. Any future applications will be considered on their merits taking into account the proposals set out in this plan and the Strategic Plan (see Maps 3 and 6). Natural Environment Proposal 2 (Green Gap) Between the settlements of Douglas and Onchan in the area straddling Blackberry Lane, development which would erode the separation and detract from the openness between the settlements will not normally be supported. Applications may be considered favourably if reason for an exception can be demonstrated in line with General Policy 3(g). Laxey and Baldrine - Encroaching ribbon development along the A2 C oast Road which connects Laxey and Baldrine has the potential to connect the two settlements. At present this area largely retains its sense of being in the open countryside with clear sea views. Additionally, services for networked water supply and other essential utilities would be difficult to provide for additional development in this area (see Maps 3, 7 and 9). Natural Environment Proposal 3 (Green Gap) Between the settlements of Laxey and Baldrine, development which would erode the separation and detract from the openness between the settlements will not be supported. Glen Vine and Crosby - These two settlements, although proximate in location, are separate and distinct in many ways. Consultation has clearly demonstrated this through the views expressed during the stages of plan development. In cases such as this, the breaks in the urban fabric and the features of nature which provide a sense of openness should be protected from development which would erode this (see Maps 3 and 10). Natural Environment Proposal 4 (Green Gap) Between the settlements of Glen Vine and Crosby, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. Douglas, Union Mills and Strang (see Maps 3, 4 and 8) Natural Environment Proposal 5 (Green Gap) Between the settlements of and Douglas, Union Mills and Strang, development which would erode the separation and detract from the openness between the settlements is unlikely to be supported. The Upland Environment The Manx Uplands are an iconic part of our landscape and heritage. Reference to the 'sweet mountain air' and 'green hills and rocks' are enshrined in our national anthem and the colours of the heather and gorse are woven into the very fabric of Manx tartan. The hills are a place of great beauty, yet for some they are also a place to work and for others a place to exercise or simply enjoy open space. Our Uplands are also home to plants and animals that whilst familiar to us, are rare and impor tant in a global and European context. Furthermore, the uplands are a rich repository of cultural and archaeological remains, which are sensitive to change and can easily be damaged by inappropriate development. Production of food is an important and obvi ous function of hill land. But surprisingly, the Manx hills provide everyday functions that most people take for granted. Peatlands, which cover most of our hills reduce the impacts of climate change by locking up carbon dioxide, collect and filter our drinking water and slow the passage of rainfall into streams and rivers, thus reducing downstream flood risk. These multiple uses are of great benefit to the economy of the Isle of Man and the well - being of its people. It is important that the hills continue to provide these benefits long into the future. Ensuring sustainable management of such a wide range of uses to the satisfaction of all interested parties whilst retaining functions essential to the well -being of the Isle of Man is of paramount importance. The Isle of Man Government is the owner and landlord for the majority of the Uplands in the East region and is therefore in a position to implement policy which will deliver the optimum range of ecosystem services. Appropriate and positive Upland management such as controlled rotational burning/cutting of heather and low intensity grazing helps to reduce the fuel load of the hill, provides firebreaks and reduces the risk of unplanned wildfires that further protects the biodiversity of the site, but also the vast amounts of carbon locked away in the peat soils. The majority of this work is carried out by The Department of Environment, Food & Agriculture's grazing and shooting tenants. The Manx Uplands are critically important from a habitat and biodiversity perspective. The hills in the East support a significant number of breeding hen harriers; however, other native Upland breeding birds such as curlew and red grouse have suffered severe declines in recent decades and as such are of high conservation concern. Strict control of access and recreational activity on vulnerable soils should be implemented to reduce soil erosion and subsequent carbon loss. Curlew and hen harriers are recognised as an internationally important species, while (within the EU) upland heather moorland is designated
Where a replacement dwelling is permitted, it must not be substantially different to the existing
Housing Policy 14: Where a replacement dwelling is permitted, it must not be substantially different to the existing in terms of siting and size, unless changes of siting or size would result in an overall environmental improvement; the new buildi ng should therefore generally be sited on the "footprint" of the existing, and should have a floor area (1), which is not more than 50% greater than that of the original building (floor areas should be measured externally and should not include attic space or outbuildings). Generally, the design of the new building should be in accordance with Policies 27 of the present Planning Circular 3/91, (which will be revised and issued as a Planning Policy Statement). Exceptionally, permission may be granted for bui ldings of innovative, modern design where this is of high quality and would not result in adverse visual impact; designs should incorporate the re -use of such stone and slate as are still in place on the site, and in general, new fabric should be finished to match the materials of the original building. Consideration may be given to proposals which result in a larger dwelling where this involves the replacement of an existing dwelling of poor form with one of more traditional character, or where, by its design or siting, there would be less visual impact. 8.11.3 It is unlikely that permission will be given for permanent replacement of dwellings which were never intended to have a permanent residential use, such as chalets and other structures built of materials for only temporary or seasonal use. 8.12 Extensions to Residential Property 8.12.1 Extensions to Dwellings in built up areas or sites designated for residential use As a general policy, in built up areas not controlled by Conservation Area or Registered Building policies, there will be a gener al presumption in favour of extensions to existing property where such extensions would not have an adverse impact on either adjacent property or the surrounding area in general. (3) Floor Space is defined in Appendix 1 (1) Floor Area is defined in Appendix 1 8.12.2 Extensions to properties in the countryside As there is a general p olicy against development in the Island's countryside, it is important that where development exists, either in an historic or recently approved form, it should not, when altered or extended detract from the amenities of the countryside. Care therefore, must be taken to control the size and form of extensions to property in the countryside. In the case of traditional properties, the proportion and form of the building is sensitively balanced and extensions of inappropriate size or proportions will not be ac ceptable where these destroy the existing character of the property. In the case of non -traditional properties, where these are of poor or unsympathetic appearance, extensions which would increase the impact of the property will generally not be acceptable . It may be preferable to consider the redevelopment of non -traditional dwellings or properties of poor form with buildings of a more traditional style and in these cases, the Department may consider an increase in size of the replacement property over and above the size of the building to be replaced, where improvements to the appearance of the property would justify this.
Planning Circular 3/91
Residential Design Guide 2021
Spatial Policy 4
Spatial Policy 5
New development will be located within the defined settlements
Strategic Policy 2
Strategic Policy 2: New development will be located primarily within our existing towns and villages, or, where appropriate, in sustainable urban extensions(2) of these towns and villages. Development will be permitted in the countryside only in the exceptional circumstances identified in paragraph 6.3. (1) Open Space is defined in Appendix 1. (2) Sustainable Urban Extensions are defined in Appendix 1 4.3.2 Appendix 3 to the Plan identifies the towns and villages, and also explains why the Department has rejected the idea of a new settlement, which was mooted in the Consultation Draft published in May 2000. 4.3.3 Each of our towns and villages has an ind ividual character arising not only from its geographical position and existing fabric, but also from its historical, cultural, and social background. This character should be protected and enhanced. Accordingly:
Strategic Policy 10
Strategic Policy 10: New development should be located and designed such as to promote a more integrated transport network with the aim to: (a) minimise journeys, especially by private car; (b) make best use of public transport; (c) not adversely affect highway safety for all users, and (d) encourage pedestrian movement (1) Business Park is defined in Appendix 1 4.6 Social 4.6.1 The provision of an adequate supply of housing to meet the needs of the wider community is essential; this is in addition to the need to replace existing substandard or poor quality dwellings. Therefore;
General Policy 3
General Policy 3: Development will not be permitted outside of those areas which are zoned for development on the appropriate Area Plan with the exception of: (a) essential housing for agricultural workers who have to live close to their place of work; (Housing Policies 7, 8, 9 and 10); (b) conversion of redundant rural buildings which are of architectural, historic, or social value and interest; (Housing Policy 11); (c) previously developed land (1) which contains a significant amount of building; where the continued use is redundant; where redevelopment would reduce the impact of the current situation on the landscape or the wider environment; and where the development proposed would result in improvements to the landscape or wider environment; (d) the replacement of existing rural dwellings; (Housing Policies 12, 13 and 14); (e) location-dependent development in connection with the working of minerals or the provision of necessary services; (f) building and engineering operations which are essential for the conduct of agriculture or forestry; (g) development recognised to be of overriding national need in land use planning terms and for which there is no reasonable and acceptable alternative; and (h) buildings or works required for interpretation of the countryside, its wildlife or heritage. 6.4 Planning Agreements 6.4.1 Where development is acceptable and in accordance with the provisions of this Plan and the relevant Area Plan, but raises issues which cannot be addressed by the imposition of planning conditions, the Department will seek to conclude an Agreement with the developer under Section 13 of the 1999 Town and Country Planning Act.
Housing Policy 4
Housing Policy 4: New housing will be located primarily within our existing towns and villages, or, where appropriate, in sustainable urban extensions (1) of these towns and villages where identified in adopted Area Plans: otherwise new housing will be permitted in the countryside only in the following exceptional circumstances: (a) essential housing for agricultural workers in accordance with Housing Policies 7, 8, 9 and 10; (b) conversion of redundant rural buildings in accordance with Housing Policy 11; and (c) the replacement of existing rural dwellings and abandoned dwellings in accordance with Housing Policies 12, 13 and 14. 8.5.6 The anticipated increase in the total number of dwellings on the Island over the Plan period is approximately 14%. By administering the programme of Area Plan preparation, the Department will ensure that there is sufficient land zoned for residential development to meet the overall housing requirement figure required by Housing Policy 1. The Department has resolved to prepare under the provisions of the Town and Country Planning Act 1999 four Area Plans which will concentrate upon larger areas of the Island. These will focus on the North, West, East and South of the Island and correspond with those areas discussed at paragraph 5.9 of the Spatial Strategy Chapter. 8.6 Affordable Housing 8.6.1 The Department is concerned about the increasing difficulties of securing the provision of affordable housing across the Island. The Department can, and does as a Housing Authority, intervene financially to provide financial support to local Authorities; financial support to prospective owner occupiers (through the House Purchase Assistance Scheme 2002) and by direct provision of new houses to rent. The provision of affordable housin g is a material consideration in the preparation of the development plan. In the current situation the Department considers that, to secure an adequate provision of affordable housing, it is appropriate to require that any area of land identified for hous ing purposes should include a contribution towards the provision of affordable housing. 8.6.2 There are currently around 1,584 (as at 31 st March 2007) households on the General Housing Waiting List. In addition, there are some 690 (as at 31 st March 2007) households registered with the Department under the House Purchase Assistance Scheme (HPAS). This indicates a total current need of some 2,274 households for affordable housing. (1) Sustainable Urban Extensions are defined in Appendix 1 8.6.3 In the current circumstances the Department considers that approximately 25 % of new housing provision should take the form of affordable housing. In assessing the appropriate percentage in each instance, the Department will have regard to the fact that the figure is a target over the Plan Period as a whole; to evidence of local housing need; to the nature of the land and viability of the scheme; and to the nature of existing adjacent housing. The 25% provision will be monitored and reviewed as part of any review of the Strategic Plan.
Transport Policy 4
Transport Policy 4: The new and existing highways which serve any n ew development must be designed so as to be capable of accommodating the vehicle and pedestrian journeys generated by that development in a safe and appropriate manner, and in accordance with the environmental objectives of this plan. 11.3.2 Notwithstanding policies within this plan which encourage travel by means other than private car it is anticipated that the number of vehicles using the Island's roads will continue to increase. This increase in demand is likely to lead to a greater need for road impro vements in order that travel can take place in a safe, effective, and environmentally acceptable manner. The Department of Transport will continue to assess the need for such improvements to public highways and undertake works where appropriate, with much of the improvement within existing roads carried out under the provisions of the Town and Country Planning (Permitted Development) Order2005. The need for improvements to the Island's highway network must be balanced against the environmental objectives of this plan.
Transport Policy 7
Transport Policy 7: The Department will require that in all new development, parking provision must be in accordance with the Department's current standards. The current standards are set out in Appendix 7. 11.5.4 New development can have a significant impact in terms of the traffic generated by it and the impact on the various modes of travel. The Department considers that proposals which are likely to be significant traffic generators should be accompanied by a Transport Assessment(1) which should look at all modes of transport including access by public transport, cycling and on foot.
Condition 1
The development hereby approved shall be begun before the expiration of four years from the date of this decision notice.
Condition 2
Notwithstanding the provisions of the Town and Country Planning (Permitted Development) Order 2012 (or any Order revoking and/or re-enacting that Order with or without modification) no extension, enlargement or other alteration of the dwelling(s) hereby approved, other than that expressly authorised by this approval, shall be carried out, without the prior written approval of the Department.
Condition 3
The development hereby approved shall not be occupied or operated until the means of vehicular access has been constructed in accordance with the approved plans, and shall thereafter be retained for access purposes only.
Condition 4
The development hereby approved shall not be occupied or operated until the parking and turning areas have been provided in accordance with the approved plans. Such areas shall not be used for any purpose other than the parking and turning of vehicles associated with the development and shall remain free of obstruction for such use at all times.
Condition 5
Prior to the occupation of the dwelling hereby approved the new wire fencing annotated as "08" on drawing 10B shall be completed and retained thereafter.
Condition 6
No development shall commence until a schedule of materials and finishes and samples of the materials to be used in the construction of the external surfaces, including roofs, have been submitted to and approved in writing by the Department. The development shall not be carried out unless in accordance with the approved details.
Condition 7
All planting, seeding or turfing comprised in the approved details of landscaping plan 12B and green roofs to garage and lower ground floor building must all be carried out in the first planting and seeding seasons following the completion of the development or the occupation of the dwelling, whichever is the sooner. Any trees or plants (green roof) which die or become seriously damaged or diseased must be replaced in the next planting season with others of a similar size and species.
Condition 8
Prior to the occupation of the dwelling hereby approved the integrated bat and bee bricks shall be installed as shown on drawing 'Proposed Elevations 01' and retained thereafter.
Condition 9
No approval is hereby given for the installation of the bird boxes as shown on drawing 18A, instead these bird boxes shall be installed to the northern elevation prior to the occupation of the dwelling.
Condition 10
Prior to the commencement of any development details of measures to be undertaken to prevent bird strikes on clear glazing shall be submitted to and approved in writing by the Department. This approved scheme shall be completed prior to the occupation of the dwelling and shall be retained thereafter.
Condition 11
The living accommodation within the lower ground floor as shown on drawing 16 shall only be used in association with the main dwelling house hereby approved and for purposes incidental to the use of main dwelling house as a single dwelling, for no commercial purposes and only in accordance with the internal layout shown on plan 16 received on the 27.08.2024.
Reserved matters application for erection of a new dwelling, approval of the details of siting, design, external appearance and internal layout of the dwelling, the means of access and the landscaping of the site
Approval in principle for the erection of a dwelling
Approval in principle to erect a detached dwelling