Ballamaddrell Cottage
Technical Note
January 2023
Manx Wildlife Trust: 7-8 Market Place, Peel. Isle of Man.
This report is prepared by Manx Wildlife Trust Consultancy for the sole and exclusive use of Polly Garrett and their contractors in response to their particular instructions. No liability is accepted for any costs, claims or losses arising from the use of this report or any part thereof for any purpose other than that for which it was specifically prepared or by any party other than Polly Garrett. Any biological records for wildlife found in survey will eventually be submitted to Manx Biological Recording Partnership. This report does not prevent MWT pursuing its charitable objectives in relation to planning.
This report has been prepared by an environmental specialist and does not purport to provide legal advice. You may wish to take separate legal advice.
The information which we have prepared and provided is true and has been prepared and provided in accordance with the BS42020 2013 and Chartered Institute of Ecology and Environmental Management's Code of Professional Conduct and guidelines for preliminary ecological appraisals (CIEEM 2017). We confirm that the opinions expressed are our true and professional bona fide opinions.
Signed (Author) Electronic Signature
Signed (QA) Electronic Signature
Sarah Hickey
| Job number: | MWT 22_75 |
| Title: | Ballamaddrell Cottage – Technical Note |
| Client: | Polly Garrett |
| Prepared by: | Sarah Hickey |
| Verified by: | Adam Denard |
| Date of Issue: | January 2023 |
| Version: | 1 |
| Revisions: | 0 |
| Status: | FINAL |
1.0 Introduction ..... 4 2.0 Discharge of Planning Conditions 8 - 10 ..... 5 Appendix I: Trees with potential roost features ..... 7 Appendix II: Bat and bird box plan ..... 8 Appendix III: Lizard hibernaculum ..... 10
Sarah Hickey BSc (Hons) MRes is an ecologist with several years' experience in baseline ecological survey and assessment and specialist protected species surveys for bats, Common Lizard and Common Frog. Sarah holds a master's degree in Research in the Natural Environment from the University of Edinburgh and has contributed to the Independent Climate Action Report for the IOM Government (Appendix 10 (a) Peatlands).
Adam Denard BSc (Hons) has been a professional ecologist for over 10 years, with particular emphasis on recording and assessing habitats in England and the Isle of Man for their potential to support protected species. Adam regularly produces professional ecological reports within the Isle of Man planning system, including Ecological Impact Assessment (EcIA), Preliminary Ecological Appraisal (PEAR) and specialist surveys for birds, bats, reptiles and amphibians.
1.1 MWT Consultancy were commissioned by Polly Garrett in relation to a planning application for work on Ballamaddrell Cottage, Grenaby Road, Ballabeg, Isle of Man (PA 22/00473/B). The purpose of this technical note is to discharge planning conditions 8,9 and 10 :
Reason: To provide adequate safeguards for the ecological species existing on the site.
Reason: To provide adequate safeguards for the ecological species existing on the site.
The statement shall include the provision of a new hibernacula feature for lizards in a sunny spot close to a boundary hedge or wall. The development shall not be carried out other than in accordance with the submitted Method Statement.
Reason: To provide adequate safeguards for the ecological species existing on the site. 1.2 This report is based on the Protected Species Report (MWT Consultancy, December 2021) and the Bat Emergence Survey Report (MWT Consultancy August 2022).
| Table 1: PWMS Ballamaddrell Cottage | |
| Ecological Feature | Precautionary Working Method Statement |
|---|---|
| Common Lizard |
|
2.1 Three trees on site were identified as having potential roost features (PRFs) for bats (refer to Appendix I for locations). 2.2 Prior to felling, these PRFs will be checked for roosting bats and nesting birds by a suitably qualified ecologist. 2.2 Following the inspection of PRFs, the advice of the ecologist will be followed.
2.4 An integrated bat box suitable for crevice-roosting species i.e. Common Pipistrelle Pipistrellus pipistrellus (recorded during bat emergence surveys). One will be included on the south facing wall, at eaves level, as shown in Appendix II.
2.5 A universal nesting brick suitable for a range of bird species will be located on the north facing wall, at eaves level, as shown in Appendix II.
2.6 A precautionary working method statement (PWMS) for Common Lizard, breeding birds and Schedule 8 plants is shown below in Table 1.

Figure 3: The location of trees with PRFs.

Example of an integrated bird brick suitable for a range of species (available from nhbs.com) Example of integrated bat box suitable for crevice-roosting species (available from nestbox.co.uk)


Legend
Hibernacula construction process (Top: Dig a hole, Middle: Infill with recycled materials, Bottom: Cover with cotton sheet, soil and turf) (From Preston Montford Field Centre)