Consultation 1 Ecopolicy Officer
Spencer, Daniel
From: Costain, Sophie (DEFA) Sent: 07 May 2024 10:23 To: DEFA, Planning Conditions Subject: PA 24/10029/AIR - Information in relation to conditions 6, 7 and 8 for PA
23/00759/B - Tree Plan and Precautionary Working Method Statement at Ballamaddrell Cottage, Ballabeg.
Good morning
RE: PA 24/10029/AIR - Information in relation to conditions 6, 7 and 8 for PA 23/00759/B Tree Plan and Precautionary Working Method Statement at Ballamaddrell Cottage, Ballabeg.
The Ecosystem Policy Team are content with the information provided in the Manx Wildlife Trust’s Technical Note for Ballamaddrell Cottage dated January 2023; Manx Root’s Tree Planting Plan (Drawing No. PP-170123) and Tree Planting Proposal (Document Ref. PP-170123); & Mark Blair Design’s Soft Landscaping and Pedestrian Path Detail Drawing (Drawing No. 203).
We consider that conditions no. 6 and 8 of PA 23/00759/B have been satisfied. Best wishes
Sophie
Miss S Costain, Ecosystem Policy Officer Department of Environment, Food & Agriculture, Thie Slieau Whallian, Foxdale Road, St Johns, Isle of Man, IM4 3AS Tel +44 (0)1624 685963 Mob +44 (0)7624 431301 Fax +44 (0)1624 685851 Email [email protected] or [email protected] Website: www.gov.im/defa DEFA - working for a clean, safe, healthy, attractive and vibrant environment which will be enjoyed by present and future generations alike.
Our Island, Our Environment, Our Future.
Working Together for a Sustainable Future Gobbragh Cooidjagh Son Traa Ry-Heet Shassooagh