Remove per Condition 8 re the AMS both the (1) All Protective Fencing (2) All Construction Exclusion Zones on ALL THREE drawings highlighted areas in YELLOW.
Notes
BS 5837.2012 - Tree Protection Plan This drawing is to accompany an Adiponcofloral Method Statement (AMS). Tree crowns and Root Protection Areas (RPA) are coloured in accordance with the Standard. RPA are hatched for easier interpretation. Recommended tree protection during construction has been displayed. Please refer to the AMS for specifications. For further information relating to this survey please refer to the associated report or contact Ben Brooker - 07624 259720 - [email protected]
Legend:
A technical site plan showing a building footprint overlaid with colored circles representing tree root protection areas and individual tree references.
MANXROOTS
TREES: BLENBOBCMENT
PROJECT
Balladocle House
DRAWING NAME
Tree Protection - HOUSE
DWG by BB
DATE 17/08/21
SCALE 1:500 @ A3
DWG No. TP-170821
A technical legend from an arboricultural report displaying symbols for tree categories (A, B, C, U) and construction exclusion zones.
Copyright in submitted documents remains with their authors. Request removal
Source & Provenance
Official reference
24/10002/AIR
Source authority
Isle of Man Government Planning & Building Control