Remove per Condition 8 re the AMS both the (1) All Protective Fencing (2) All Construction Exclusion Zones on ALL THREE drawings highlighted areas in YELLOW.
Notes BS 0837.2012 - Tree Protection Plan The drawing is to accompany an Antimicrobial Method Statement (AMS). Tree cibards and Root Protection Areas (RPAs) are coloured in accordance with the Standard. RPAs are hatched for easier interpretation. Recommended tree protection during construction has been displayed. Please refer to the AMS for specifications. For further information relating to this survey please refer to the associated report or contact Ben Brooker - 07624 259720 - [email protected].
Legend:
Cal. A Tree
Cal. B Tree
Cal. C Tree
Cal. D Tree
Cal. E Tree
Cal. F Tree
Cal. G Tree
Cal. H Tree
MANXROOTS TREE BASKETBALL PROJECT Balladzole House
DRAWING NAME Tree Protection - ACCESS
DWG by BB DATE 21/07/21
SCALE N75 @ A3 DWG No. TP-210721a
A technical site plan illustrating tree protection zones, canopy spreads, and access routes for a property named Ballaclooe House.This image displays a tree protection plan and site layout for a project named 'Balloon House', featuring a building footprint surrounded by trees and yellow hatched areas. It includes a legend detailing tree protection zones and notes on arboricultural methods.
Notes BS 1857:2012 - Tree Protection Plan This drawing is to accompany an Arboriculture Method Statement (AMS) Tree crowns and Root Protection Areas (RPAs) are coloured in accordance with the Standard. RPA's are hatched for easier interpretation. Recommended tree protection during construction has been displayed. Please refer to the AMS for specifications. For further information relating to this survey please refer to the associated report or contact Ben Brooker - 07634 259720 - [email protected]
Legend: Cat. A Tree Crown Amp. 1857 Cat. B Tree Crown Amp. 1857 Cat. C Tree Crown Amp. 1857 Patio. Amsc. 1857 Patio. Amsc. 1857
PROJECT Babadoole House
DRAWING NAME Tree Protection - BARW
DWG by BB
DATE 21/07/21
SCALE NTB @ A3
DWG No. TP-210721b
Copyright in submitted documents remains with their authors. Request removal
Source & Provenance
Official reference
24/10002/AIR
Source authority
Isle of Man Government Planning & Building Control