Loading document...
Wilson Consulting Limited Kempis House Orrisdale Road Ballasalla Isle Of Man IM9 3AE
TOWN AND COUNTRY PLANNING ACT 1999 The Town and Country Planning (Development Procedure)(No 2) Order 2013
In pursuance of powers granted under the above Act and Order the Department of Environment, Food and Agriculture determined to APPROVE an application by Mr E P & Mrs T K D Kerruish, Ref 19/00875/B, for the Alterations, erection of a replacement dwelling and change of residential curtilage at Ardonan Farm House Ardonan Lane Regaby Ramsey Isle Of Man IM7 3HN subject to compliance with the following condition(s) and notes (if any):
Reason: To comply with article 14 of the Town and Country Planning (Development Procedure) (No2) Order 2013 and to avoid the accumulation of unimplemented planning approvals.
Reason: A reason why the application is considered acceptable is due to the overall environmental impacts as outlined on Housing Policy 14 and namely the eco efficiency credentials of the new dwelling.
biodiversity and the development shall be undertaken in full accordance with this Agreement and maintained as such thereafter.
Reason: A reason why the application is considered acceptable is due to the overall environmental impacts and the improvement and enhancement of biodiversity throughout the site is one measure to achieve this.
Reason: To ensure that sufficient provision is made for off-street parking and turning of vehicles in the interests of highway safety.
Reason: Planning permission has been approved on the basis that the existing dwelling would be replaced and therefore in accordance with Housing Policy 14 and General Policy 3.
Reason: The application has not sought approval of the bat roosts for such purposes and the application has been considered on this basis; the building has a protect species within and use as living accommodation could adversely affect this species (bats) and in accordance with General Policy 3, Housing Policy 4 and Environment Policy 1 which restrict new dwellings on land not designated for development.
This approval relates to the submitted documents and drawings reference numbers 182/001, 182/002, 182/003, 182/010, 182/020, 182/021, 182/022, 182/023, 182/024, 182/025, 182/026, and Design Statement all received on 2nd August 2019 and Bat Survey received 12th September 2019.
NOTE Bats are listed on Schedule 5 of the Wildlife Act 1990. It is an offence to intentionally or recklessly kill, injure or take, or to damage or destroy, or obstruct access to, any structure or place bats use for shelter or protection, or to disturb bats while they occupy a structure or place which they use for that purpose.
NOTE If the bat roost is additionally going to be used for storage then the occupants will need to apply for a Protected Species Licence from the Ecosystem Policy Team due to the risk of disturbing bats. For further information contact the Ecosystem Policy Team [email protected].
NOTE Birds, their nests, eggs and dependant young are legally protected under the Wildlife Act 1990 and it is an offence to intentionally or recklessly kill, injure or take a bird, chick or egg or damage or destroy a nest. In addition, species listed on Schedule 1 of the Act are protected from disturbance.
Birds nest from February through to the end August.
Date of Issue: 19th November 2019
Guidance Note
This decision was made by the Planning Committee in accordance with the authority delegated to it.
All correspondence which led to the assessment and decision is available to view on the Government’s website (via Online Services) or at the Department’s offices Murray House, Mount Havelock, Douglas.
https://www.gov.im/planningapplication/services/planning/search.iom This decision refers only to that applied for under the The Town and Country Planning (Development Procedure)(No 2) Order 2013.
Any appeal against this decision must be in accordance with the criteria set down in that instrument.
Specifically, a valid appeal must be in writing, signed by the appellant, and submitted to the Department within 21 days of the date of this Notice. To further validate the appeal it must contain:
An appeal form and guidance notes are available from either Planning & Building Control, Tel 685950, or to download from the Department’s website https://www.gov.im/categories/planning-and-building-control/planningapplications/planning-appeals/how-to-appeal/
If no appeal is lodged within 21 days of the date of issue overleaf, and this decision becomes final, the Department’s public reference copy (counter copy) of the planning application may be collected by the applicant or their agent from Murray House.
Copyright in submitted documents remains with their authors. Request removal