Energy Impact Assessment/Statement
The 'Isle of Man Strategic Plan, 2007' states: Energy - Policy 5: 'The Department will prepare a Planning Policy Statement on Energy Efficiency. Pending the preparation and adoption of that PPS the Department will require proposals for more than 5 dwellings or 100 square metres of other development to be accompanied by an Energy Impact Assessment. ${ }^{(1)}$
The above Policy Statement is further defined with the following: 12.2.10 'In addition to alternative sources of energy supply, the Strategic Objectives in Chapter 3 refer to the promotion of efficiency and economy in the use of resources and the reduction of energy consumption by more efficient use of energy through energy conservation, recycling and waste reduction. There are numerous ways of increasing energy efficiency and reducing energy consumption both in the design and construction of new development and its subsequent operation, management and maintenance. The Building Regulations set standards for energy efficiency in new buildings including walls, windows, roofs and heating appliances. But the design and layout of new developments can in themselves reduce energy consumption through for example Passive Solar Estate Layouts. ${ }^{(2)}$ Added to this are the various solar panel, photovoltaic cell, solar energy and heat pump technologies. ${ }^{(1)}$ 12.2.11 'Within the Strategic Objectives relating to resource and to energy efficiency, the Department wishes to promote a greater awareness and recognition, of the benefits both to the environment and the consumer of energy efficiency in its widest sense. To this end the Department intends to prepare a Planning Policy Statement on Energy Efficiency. In the meantime it will require a planning application for more than 5 dwellings or commercial development of more than 100 square metres to be accompanied by an Energy Impact Statement ${ }^{(3)}$ to demonstrate what measures have been taken in the design of the development to reduce energy consumption and increase energy efficiency. ${ }^{(1)}$ (1) Isle of Man Strategic Plan 2007 (2) UK Department of the Environment General Information Report 27 - Passive Solar Estate Layout (3) Definition From Appendix 1 of Isle of Man Strategic Plan 2007 - 'Energy Impact Statement: An assessment, prepared by the developer/applicant, of the impacts of the development in terms of energy consumption and proposals for reducing that consumption and improving the energy efficiency of the development.'
The attached document is a suggestion of a possible format for an Energy Impact Assessment as required by Energy Policy 5 of the Isle of Man Strategic Plan.
The headings for the Energy Impact Assessment have been drawn from the following documents:
Town and Country Planning Act 1999 - Isle of Man Strategic Plan 2007
UK Communities and Local Government documents: 'Code for Sustainable Homes - A Step-change in sustainable home building practice'. 'Regulatory Impact Assessment Energy Performance of Buildings Directive Articles 7-10'
BRE BREEAM Ecohomes Standards and Sustainability Checklist (including Pre-Assessment Estimator) Sustainability Checklists - Woking Borough Council Energy Saving Trust - Passive Solar Estate Layout (specifically referred to in 12.2.10 of the Strategic Plan) Town & Country Planning Association (TCPA) 'Planning for Sustainable Energy'
| Category | Target | Notes | Achievable (YES / NO) | If YES – how? If NO – why not? | Notes |
|---|---|---|---|---|---|
| Design / Specification Energy / CO² | Improve thermal efficiency of the walls, windows and roof by eg. more insulation or better glass | Does the design specification demonstrate an improvement over currently utilised specifications / exceed current Building Regulation requirements? | YES | Requirements exceeded where applicable. | |
| Reduce air permeability – improving the control of fresh air into the home | Specific attention paid to the prevention of uncontrolled ventilation. Passive Ventilation methods also considered. | YES | Have developed a set of ‘Robust Details’ with particular attention paid to air leakage (as well as thermal insulation). | ||
| ≤1.3 Heat Loss Parameter (HLP) | Fabric of the home designed to reduce thermal bridging. | YES | The properties are designed to reduce thermal bridging. | ||
| Reduce Energy Consumption in respect of Space Heating | • High efficiency condensing boilers – SEDBUK rating A • Alternative (oil/LPG boilers)– SEDBUK rating A • Alternative methods of heating eg. Biomass, CHP, Heat Pump • Passive Solar design • Communal heating | YES NO NO NO NO | Fitted as standard Not applicable to this scheme Not applicable to this scheme Properties have been orientated to make maximum use of solar gain Not applicable to this scheme |
SCHEME: Oak Road, Peel
| Reduce Energy Consumption in respect of water heating | Inclusion of solar thermal water heating OR Properties to be left ‘solar enabled’ for retro-fit. | NO | Not applicable to this scheme. | Propose to make available as a ‘purchaser’s extra’ | |
|---|---|---|---|---|---|
| Improved energy efficiency of lighting (internal) | ≥75% energy efficient fixed fittings OR state %. | YES | Energy efficient light fittings provided throughout. | ||
| Improved energy efficiency of lighting (external) | External lighting provided by dedicated energy efficient fittings & daylight cut-off devices. | NO | No external lighting provided. | ||
| Improved energy efficiency of lighting (security) | All burglar security lighting is Max. 150w & fitted with movement detecting & daylight shut-off devices. | NO | No security lighting provided. | ||
| Energy Efficient fixed fittings | • ≥40% Of fixed fittings – fridges and freezers have an A+ rating. • Washing machines and dishwashers have an A rating. • Washer driers & tumble driers have a B rating. | YES NO YES | Where included in 4-bed dwellings Not provided, washer/driers only provided in first floor flats. | ||
| Energy Efficient fittings (retro purchased) | Information provided to the purchaser on the benefits of purchasing energy efficient white goods where not supplied with the new home. | YES | Information is provided within the ‘handover pack’. | ||
| Reduce CO2 Emissions | Provide safe, weather-proof & secure cycle storage for eg. 50% of the properties. | NO | Not applicable to this scheme |
| Reduce CO2 Emissions | Provide a room or space in a quiet room, that can easily be set up as a home office. | NO | Not applicable to this scheme | ||
|---|---|---|---|---|---|
| Reduce Energy Consumption | (10%) of total energy demand is supplied from local renewable or low carbon energy sources eg. solar pv, wind turbines. | NO | Not applicable to this scheme | ||
| Reduce energy consumption | Provide FOC or for purchase or provide information – Smart Meters (visible display of energy consumption) | YES | Information provided within the ‘handover pack’. | ||
| Design / Specification Water | Reduce water consumption - target 120l/p/d (litres per day OR LESS (state if aiming to achieve lower) | 6/4 dual flush toilet | YES | Fitted as standard | |
| Reduce water consumption - target 120l/p/d (litres per day) OR LESS (state if aiming to achieve lower) | 6-9 litres per minute shower (note – average electric shower is approximately 6/7 litres per minute). | YES | Fitted as standard. | ||
| Reduce water consumption - target 120l/p/d (litres per day) OR LESS (state if aiming to achieve lower) | 18ltr max. volume dishwasher. | YES | Lower (where included in 4-bed dwellings) |
| Reduce water consumption - target 120l/p/d (litres per day) OR LESS (state if aiming to achieve lower) | 60ltr max. volume washing machine. | NO | Not provided. | ||
| Reduce water consumption - target 120l/p/d (litres per day) OR LESS (state if aiming to achieve lower) | Provide a system to collect rain water for use in external irrigation / watering (eg. water butts). | NO | Not applicable to this scheme | ||
| Reduce water consumption - target 120l/p/d (litres per day) OR LESS (state if aiming to achieve lower) | Grey Water Technology (collection and use of bath water etc. for toilet flushing). | NO | Not applicable to this scheme | ||
| Construction | Materials | • Building materials sourced locally where feasible. • Materials from recycled sources. • Timber from sustainable sources. • Insulation materials have zero ozone depletion rate. | YES YES YES YES | All materials are sourced locally where appropriate. Materials are from recycled sources where appropriate. Timber is from sustainable sources where appropriate. Used as standard. | |
| Labour | • From local labour pool where feasible. • ‘Shared’ transport to site. | YES YES | Local labour is used where possible. Minibus is laid on for workers | ||
| Modern Methods of Construction (MMC) | Off-site construction. | NO | Not appropriate for this scheme. |
| Waste | Site Waste Management to reduce / reuse / recycle waste. | YES | Standard practice on construction sites. | ||
|---|---|---|---|---|---|
| Occupation | Waste | Provide recycling and storage facilities within/outside the property (multi-bin system) and/or provide an area (with bins) for recycling in line with the Government strategy (subject to inclusion of collection from the designated area by the local council/Government system). | NO | Not appropriate as no collection scheme is in place for recyclable waste. | |
| Waste | Provide composting facilities – for each property or communally. | NO | Not applicable to this scheme. | ||
| Reduce energy & water consumption | Provide simple user guide, (non technical) for the occupier on the operation and environmental performance of their home, including tips on how to reduce energy & water consumption. | YES | Information provided in the ‘handover pack’. | ||
| Reduce CO2 Emissions | Provide information for the occupier in respect of local alternative means of transport, cycle routes and local amenities (doctor, schools, shops etc.) | YES | Information provided in the ‘handover pack’. | ||
| Reduce Carbon Footprint | Inclusion of planting schemes. | YES | As per the landscaping plan |
Letter from Bryan G Hall Consulting Civil and Transportation Planning Engineers
Our ref: 17-168/DB/KJA please reply to Leeds office 13 September 2017
Mr D Humphrey Dandara Group Head Office Isle of Man Business Park Cooil Road Braddan Isle of Man IM2 2SA
Dear David
I refer to your request for advice in relation to the proposed residential development for some 45 dwellings on land to the west of Oak Road and to the south of existing properties served by Fuchsia Avenue.
Oak Road performs the function of a local road that connects with A20 Poortown Road to the south at a four-arm roundabout junction and with A4 Ramsey Road to the north at a four-arm roundabout junction. In addition there is also a connection to the wider highway network at Ballaquane Road via Rowan Avenue. Oak Road provides frontage access to residential development and provides access to other residential areas by way of a series of simple priority controlled junctions that provide access to designated Home Zones.
In the vicinity of the proposed residential development site, Oak Road has a carriageway width of some 6.1 metres with a segregated 1.8 metre wide footway along the site frontage and a grass/soft landscaped verge to the opposite side. It is subject to a 20 mph speed limit, is lit and is traffic calmed through a series of road humps and localised priority controlled narrowing at the southern corner of the site. Oak Road is a bus route and is subject to a weight restriction of 7.5 tonnes, except for access. Along the site frontage, Oak Road has a straight alignment and at the southern corner of the site, Magher Breek, a residential access road designated a Home Zone, connects with Oak Road.
The proposed residential development can be served by a simple priority controlled junction with Oak Road. Such a junction is capable of providing minimum visibility splays of 2.4 metres $\times 22.0$ metres in accordance with advice in Manual for Manx Roads for major road
Continued
Bryan G Hall Ltd Registered in England \& Wales Co No: 4104802
Registered Office Suite E15 Joseph's Well Hanover Walk Leeds 153 IAB
London Office Lighterman House 26-38 Whartdale Road London N1 9RY
Telephone: 01132461555 Telephone: 02035532336 Email: [email protected] Website: www.bryanghall.co.uk
Continuation 1 Mr D Humphrey 17-168/DB/KJA
13 September 2017
speed limits of 20mph. The proposed shared surface loop arrangement within the site accords with advice in MfMR and provides a permeable site layout for all users that connects with the highway network. The layout provides for service vehicles to enter and leave the site to/from Oak Road in a forward gear.
Residential development typically generates between 0.6 and 0.8 vehicle movements per dwelling during the morning peak period, 75% of which are likely to be leaving the development. Based on the higher figure of 0.8, a development of some 45 dwellings will generate only some 36 vehicles between 8:00am and 9:00am with 27 departing and 9 arriving. This equates to one vehicle every 1 to 2 minutes using Oak Road. This level of additional movements will not be noticeable and hence will not have a significant impact on the local highway network. Furthermore 'Guidance on Transport Assessment' advises that for developments less than 50 units no assessment should be required.
I conclude that the proposed development can be safely accessed from Oak Road and the traffic movements likely to be generated by the development will not have a material impact upon the operation of the local highway network.
If you require any further advice at this stage, please let me know. Yours sincerely
David Bell Director
Bryan G Hall Ltd Registered in England & Wales Co No: 4104802
VAT No: 399 4601 07
Registered Office Suite E15 Joseph's Well Hanover Walk Leeds LS3 1AB
Telephone: 0113 246 1555
London Office Lighterman House 26-36 Wharfdale Road London N1 9RY
Telephone: 0203 553 2336
Email: [email protected]
Website: www.bryanghall.co.uk
Copyright in submitted documents remains with their authors. Request removal